US89 Farmington Slope Stabilization

US89 Farmington Slope Stabilization

Project US89 Farmington Slope Stabilization The Details The Challenge The US 80 Farmington Slope Stabilization Project presented significant engineering challenges that tested our expertise at Rock Supremacy. The project site featured a steep, unstable slope composed...
Hells Canyon

Hells Canyon

Project Hells Canyon The Details The Challenge The Hells Canyon project pushed our team at Rock Supremacy to the limits of precision and safety. Tasked with installing a mesh rockfall mitigation system on the sheer cliff faces of one of the most rugged terrains in the...
Lava Hot Springs

Lava Hot Springs

Project Lava Hot Springs The Details The Challenge We were tasked with addressing a critical rockfall hazard at the Lava Hot Springs site, where loose rock threatened both public safety and infrastructure. The Solution The solution not only needed to stabilized the...
Moffat Subdivision

Moffat Subdivision

Project Moffat Subdivision The Details The Challenge The Moffat Subdivision project presented a critical challenge: stabilizing a railway located perilously close to a river, with loose soil threatening the integrity of the hillside. The unstable terrain created a...
Terwilliger Plaza

Terwilliger Plaza

Project Terwilliger Plaza The Details The Challenge The Terwilliger Plaza project involved the installation of 30,000sf of Tecco system for a private client in downtown Portland.  We also applied a shotcrete buttress that was over 80 cubic yards helping to secure the...