GRAD Tunnel

The Details

The Challenge

The GRAD tunnel project was an over 3000 ft long tunnel rehabilitation project. The tunnel had collapsed and we are working to re-open the tunnel and re-structuring. 

The Solution

This project involved widening the tunnel and making it taller. This design/build project involved completely re-shaping and re-structuring the entire tunnel for both stabilization and to add extra clearance as well as adding a concrete tunnel floor and setting up drainage collection for internal water sources.

LF Tunnel Repaired

Under Budget

Weeks Ahead of Schedule

Amazing Result