Jefferson Street Rockfall

The Jefferson street project involved a 30,000sf Tecco wire mesh installation.  We installed the mesh in tight spacing and a limited work window due to its proximity to the busy freeway.  We installed over 700 Tecco nails which were each 15 feet long.  What made this project different from our other Tecco systems is after the mesh was in place, was the application of hydroseed that stuck to the metal wire, within months the grass seed grew to hide the wire.  We were able to completely stabilize an unstable rock slope, and make it a beautiful grass-covered slope.